Two M2erlin installation Lochmaben
Our engineers carried out the complete installation of services including mains electrics, mains water and even assisted the builder in the layout for the AMS machines
Our engineers carried out the complete installation of services including mains electrics, mains water and even assisted the builder in the layout for the AMS machines
As the pictures shows our team of engineers installed two Fullwood M2erlin automatic milking machines. The M2erlins were both side entry, Expert specification complete will Crystal lab milk analysing technology. Our engineers carried out the complete installation of services including mains electrics, mains water and even assisted the builder in the layout for the AMS machines. They planned the installation from the start working out cable routes and pipe runs, ensuring the installation was something to be proud of. We also installed the compressed air lines along with the pre commission air compressor from Northern Air Compressors Ltd. We installed a Collinson 70mm feed auger to supply the two M2erlins with cake.
The milking in could not have went better, our engineers stayed on site for the first 48 hours then called in everyday for the next few days to make sure the client was happy and confident with his machines.
We replaced a clients old Packo 6,000ltr RMIB bulk tank for a new Packo 12,000ltr rsDiB bulk milk tank. We had a separate ice water pump just for the plate cooler allowing individual control and a high cooling capability.
This was our first M2erlin installation in Cumbria and it was our biggest to date. Along with installing three M2erlin Experts we also installed a Packo 14,000ltr LSDIB and a PIB 60 ice builder and two Collinson feed silos and auger systems. We mounted a ladder rack above our M2erlins to support all our supply […]