Installation of power and lighting for new bakery

Installation of sub mains, 3 phase DB and supplies to commercial ovens and catering equipment

This job consisted of turning one large unit into two separate smaller units one a bakery and one a commercial kitchen. This involved installing a new 3 phase supply into the bakery supply a new 250amp distribution board. We also installed a high level trunking around the unit allowing us to install conduit drops for isolators and power points to the exact location they were needed.

Similar Case Studies

6 M2erlin Installation

mix-2

Fullwood’s largest M2erlin installation in the U.K

Merlin AMS Machine Install

Merlin AMS MAchine

This was a complete new installation consisting of cubical housing, AMS area, plant room and dairy.

Installation of LED lighting in new sheep shed

led-lighting-1

This was a relativly small electrical installation consisting of four 50w LED floods inside the shed and one 30w flood outside controlled off a photocell. The client was extremely happy with the LED light and we have since installed more on the farm